Change order
Request changes to an existing project or contract.
Why these fields
- Name: Name captures a short, searchable answer and is required to complete the request.
- Email: Email provides a validated reply address and is required to complete the request.
- Project / contract number: Project / contract number captures a short, searchable answer and is required to complete the request.
- Requested change: Requested change leaves room for context and detail and is required to complete the request.
- Estimated cost impact: Estimated cost impact collects a value that can be validated and compared but remains optional.
- Needed by: Needed by collects an unambiguous date but remains optional.
Fields
NametextrequiredEmailemailrequiredProject / contract numbertextrequiredRequested changetextarearequiredEstimated cost impactnumberNeeded bydate
Preview
Code
<form action="https://forms.formward.eu/f/your-form-id" method="POST" class="space-y-4 max-w-lg">
<label for="name" class="block text-sm font-medium mb-1">Name</label>
<input type="text" name="name" id="name" required class="block w-full rounded border border-gray-300 p-2" />
<label for="email" class="block text-sm font-medium mb-1">Email</label>
<input type="email" name="email" id="email" required class="block w-full rounded border border-gray-300 p-2" />
<label for="project" class="block text-sm font-medium mb-1">Project / contract number</label>
<input type="text" name="project" id="project" required class="block w-full rounded border border-gray-300 p-2" />
<label for="description" class="block text-sm font-medium mb-1">Requested change</label>
<textarea name="description" id="description" required class="block w-full rounded border border-gray-300 p-2"></textarea>
<label for="cost_impact" class="block text-sm font-medium mb-1">Estimated cost impact</label>
<input type="number" name="cost_impact" id="cost_impact" class="block w-full rounded border border-gray-300 p-2" />
<label for="needed_by" class="block text-sm font-medium mb-1">Needed by</label>
<input type="date" name="needed_by" id="needed_by" class="block w-full rounded border border-gray-300 p-2" />
<input type="text" name="_gotcha" tabindex="-1" autocomplete="off" class="hidden" aria-hidden="true" />
<button type="submit" class="rounded bg-black text-white px-4 py-2">Send</button>
</form>Customize before publishing
- Remove fields you do not need and mark only essential answers as required.
- Replace placeholder wording with terms your audience already understands.
- Add your privacy notice, retention details and expected response time.
- Test keyboard focus, validation errors and the confirmation state on mobile.
Use this with Formward
Create a form, copy your endpoint, and replace https://forms.formward.eu/f/your-form-id in the code above.